Top of the World Windpower Project

On September 21, 2009, Duke Energy dba Top of the World LLC filed an Application for a Permit to construct and operate its Top of the World Windpower Project near Rolling Hills in Converse County.  The project began construction in 2010, utilize about 370 construction workers, and consists of 110 wind turbine generators. The DIvision was notified that construction of the facility was 90% complete on September 3, 2010. The facility is in operation.  09-03


File Date