Enforcement Actions

The DEQ undertakes enforcement actions to preserve safe environmental conditions throughout Wyoming. 

This page contains information on the enforcement actions that the Water Quality Division may undertake, as well as a record of enforcement actions that have been undertaken by WQD.

If the download box is not working below, please click here.

Electronic Documents Submittal

Electronic document submittal is available for WQD permit applications, reports, and other communications.
Visit:  WDEQ Water Quality Division Downloads

You do NOT need to follow up the electronic submission with a hard copy submission unless you are specifically contacted by a WQD staff person with a request to do so.

Need to report a spill or complaint? Please visit https://deqspills.wyo.gov/home

Submitting a public comment? WQD is unable to accept public notice comments through this system. Refer to the public notice document for instructions on how to submit comments or visit https://wq.wyomingdeq.commentinput.com/comment/search.

NOTICE: All applications for water distribution systems and/or sewage collection systems that are within the Cheyenne Board of Public Utilities (BOPU) district shall be submitted to the BOPU for approval. Contact Frank Strong or Bryce Dorr at (307) 637-6460, ENGreview@cheyennebopu.org, or http://cheyennebopu.org for additional information.

Recent General Permit Authorizations

The DEQ Water Quality Division accepts comments on all permits authorized under a general permit for a period of 30 days, as provided for in W.S. 35-11-801(d).

Interested persons may mail or fax comments to the main Cheyenne office. The ‘Date’ column in the table below indicates the date the authorization was posted to the website. Comments must be received before 5:00 pm on the 30th day after the authorization was posted to the website. For example, comments for an authorization posted on 10/1/18 must be received by 5:00 p.m. on 10/31/18. DEQ does not accept emailed comments.

You may sort the table by posting date or search for the type of general permit, the county where the permit was issued, the permit number, or the name of the person or company to whom the permit was issued.

If you wish to review the general permit documents, please go to the web page for each permitting program:

If the download box is not working below, please click here.

Proposed Rules and Regulations

Water Quality Rules Chapter 12

The Wyoming Environmental Quality Council will consider proposed revisions to the
Wyoming Department of Environmental Quality Water Quality Rules Chapter 12, Design and Construction Standards for Public Water Supplies, Docket 22-3103, at a hearing to be held on November 15, 2022 in the Capitol Extension Public Meeting Room 5, Herschler Building, 122 W. 25th Street, Cheyenne, WY, 82002, starting at 9:00 a.m. (MST). The revisions include new requirements for public water supplies that propose well acidization, updates to water treatment technologies, and the incorporation by reference of the Recommended Standards for Water Works, 2018 Edition. More information is available at: https://eqc.wyo.gov/Public/Pleadings.aspx?DocketId=4336

Water Quality Rules Chapter 3

The Department of Environmental Quality has revised Water Quality Rules, Chapter 3, Regulations for Permit to Construct, Install or Modify Public Water Supplies,
Wastewater Facilities, Disposal Systems, Biosolids Management Facilities, Treated
Wastewater Reuse Systems and Other Facilities Capable of Causing or Contributing to Pollution.

The Environmental Quality Council adopted the revised rules at a public hearing located at the Capitol Extension Public Meeting Room 5, Herschler Building, 122 W. 25th Street, Cheyenne, Wyoming on June 14, 2022. The final rule was filed with the Wyoming Secretary of State on August 19, 2022.

Electronic copies of the rule are available from the Secretary of State at rules.wyo.gov , under “Current Rules,” “Environmental Quality, Dept of (020),” “Water Quality,” “Chapter 3.”

Water Quality Rules Chapter 29

The Department of Environmental Quality has created a new rule: Water Quality Rules Chapter 29, Geologic Sequestration Special Revenue Account Requirements.

The Environmental Quality Council adopted the new rule at a public hearing located at the Capitol Extension Public Meeting Room 5, Herschler Building, 122 W. 25th Street, Cheyenne, Wyoming on June 14, 2022. The final rule was filed with the Wyoming Secretary of State on August 19, 2022.

Electronic copies of the rule are available from the Secretary of State at rules.wyo.gov, under “Current Rules,” “Environmental Quality, Dept of (020),” “Water Quality,” “Chapter 29.”

Rules and Regulations

All official Wyoming State Rules and Regulations are kept at the Wyoming Secretary of State’s Office. Click here to view all current Rules and Regulations.

Class V

Class V injection facilities inject non-hazardous commercial, industrial, or municipal waste directly into or above a usable aquifer. Class V facilities may not inject hazardous waste.  Class V facilities include a variety of wells, drainfields, drywells, and leachfields.  All Class V facilities are regulated under W.S. 35-11-301 and WQRR Chapter 27. You may download the current version from the Secretary of State’s Office website.

Is my septic system a Class V well?

The US EPA fact sheet on large capacity septic systems provides basic information.

Class V Permit Types

Class V Permit Types (by Rule, General, or Individual)

Guidance for Permitting Class V CBM Wells

Guidance for Permitting Class V CBM Wells

When to submit a Permit Application or Renewal

The UIC Program requests that General Permit or Permit by Rule applications be submitted a minimum of 60 days prior to beginning construction.  Project delays may occur if applicants do not allow sufficient time for review.

Please be advised that the UIC Program requires Class V Individual permit renewals to be submitted 180 days prior to permit expiration.

Class V Permit Application Forms

Class V Permit Application Forms:
     Individual Permit,
     General Permit
     Permit By Rule

Contact
NAMEPROGRAMSPHONE
Lily BarkauGroundwater Section Manager Cheyenne(307)777-7072
VacantGround Section Geology Supervisor, UIC, GPC, & Federal Facilities Programs(307)777-8275
John PassehlFederal Facilities Program, Geology Supervisor, Cheyenne(307)777-5623
Justin ScottUIC Program, Geology Supervisor, Cheyenne(307)777-7511
Tyler HarrisUIC Program, Project Geologist, Cheyenne(307)777-7608
Aaron BirkemeierUIC Program, Natural Resources Program Principal, Cheyenne(307)777-5501
Hunter HubbardUIC Program, Project Geologist, Cheyenne  (307)777-2960
Wylee RizzitelloGPC Program, Natural Resources Program Principal, Cheyenne(307)777-9355
Julia GliciniUIC Program, Natural Resource Analyst, Cheyenne(307)777-6080
Brenden StefanowiczGPC Program, Natural Resource Analyst, Cheyenne(307)777-7092
Graeme Finley UIC Program, Senior Project Geologist, Casper  (307)473-3478
Christy HutchinsonGPC Program, Natural Resources Program Principal, Casper(307)473-3468
Steven LooseGPC Program, Project Geologist, Lander(307)335-6942
Jack LeitnerUIC Program, Natural Resource Analyst, Lander(307)335-6752
Forms and Guidance

If the download box is not working below, please click here.

Class V General Permits

GEM Database

The GEM Database is a tool for permitees, operators, and consultants to report monitoring data to the Underground Injection Control (UIC) Program.  Operators and consultants requesting access to the database for reporting must be approved by a responsible corporate officer of the permitted entity.

Currently the GEM Database is offline. To submit documents please click here: https://bit.ly/WDEQ-WQD

For inquiries regarding UIC records, please submit a Public Records Request.