The Town of Pinedale, Wyoming, will conduct a public meeting at 5:00 PM, local time, on April 8, 2024, in the Town Council Chambers located at Pinedale Town Hall, 205 Entertainment Lane, Pinedale, WY 82941.

The purpose of the meeting is to allow citizens to review and comment on the following: 1) the Pinedale Shallow Water Main Sewer Replacement Project, and 2) the Wastewater Treatment Facility Rehabilitation Phase 1 and Phase 2 Engineering Project.

The Pinedale Shallow Water Main Sewer Replacement Project consists of removal of existing sewer mains and services beneath Shanley Avenue and Jade Street and replacement with approximately 1100 linear feet of eight and ten-inch diameter pipe. Work includes the completion of necessary surface repairs due to the location of the underground infrastructure and is anticipated to be constructed in fall 2024 in conjunction with the Shallow Water Main Replacement Project.

The Wastewater Treatment Facility Rehabilitation Phase 1 and Phase 2 Engineering Project will remove and replace deteriorated anaerobic pond covers and the UV disinfection system which has reached the end of its useable life, upgrade the bulk septic receiving to further protect the treatment equipment and treatment train, and install an outlet diffuser to improve mixing discharge waters across Pine Creek. The Phase 2 Engineering portion of the project will include the engineering design of a secondary treatment upgrade to the Wastewater Treatment Facility pursuant to the findings of the Wastewater Treatment Master Plan to reduce discharge of ammonia and other discharge parameters regulated by the Town of Pinedale WYPDES permit with WYDEQ. It is anticipated that the work will be completed in 2025.