Remediation

Contaminated Sites

This tab contains lists of contaminated sites in Wyoming that are unresolved, resolved, or in-project.  

If the download box is not working below, please click here.

Decommissioning

This page contains forms and information pertaining to tank decommissioning in Wyoming. 

If the download box is not working below, please click here.

Forms

If the download box is not working below, please click here.

Funding Information

If the download box is not working below, please click here.

Guidance Documents

If the download box is not working below, please click here.

Prequalification

This tab contains prequalification information, applications and lists of prequalified contractors around Wyoming. 

If the download box is not working below, please click here.

Sampling Information

This tab contains information on storage tank sampling and a downloadable list of Minimum Site Assessment (MSA) companies. 

If the download box is not working below, please click here.

Related Programs

The Storage Tank Program (STP) Remediation team coordinates cleanups at sites contaminated by eligible leaking aboveground and underground storage tanks. Consultants and contractors assist us in our remediation work. We perform remediation at both the source site and third-party sites impacted by the contamination.

Our projects typically involve five phases:

  1. Subsurface investigation to determine the magnitude and extent of the contamination
  2. Engineering design of remedial alternatives
  3. Construction and equipment supply for the designed systems
  4. Operation and maintenance of the systems
  5. Site closure after state soil and groundwater standards have been met