Produced Water Disposal & Treatment

The Produced Water Disposal & Treatment Permitting group is responsible for permitting facilities that treat water generated from coal bed methane, oil or gas production. Road or land application projects and commercial oilfield wastewater disposal facilities are also permitted by this group.

These permits use the standard construction permitting process described on the Obtaining a Permit tab above and frequently use the Pilot Plant general permit.  The Permitting Guidelines for Treatment of Produced Water document lists additional criteria for these permits. 

Additional permitting may be required for surface water (WYPDES Program) or groundwater (Groundwater Pollution Control (GPC) Program) discharges of produced water. 

When no other alternative is reasonably available for disposal of limited quantities of wastewater or exploration and production-exempt oily wastes, applicants may apply for a Road Application of Waste or Wastewater permit. See “Permitting Forms and Information” tab.

Commercial oilfield wastewater disposal facilities (COWDF) can accept some exploration and production wastes, depending on the nature of the waste. See the “Permitting Forms and Information” tab for a list and a map of active COWDFs, and Certificate of Completion and Permit Transfer of Ownership forms.

Water Quality Rules Chapter 14 requires financial assurance for COWDFs for closure and post-closure inspection, maintenance, and environmental monitoring. Visit https://deq.wyoming.gov/administration/bonding/ for bonding-specific forms and instructions.

 

Contact

Please contact us with any questions you have about the Water and Wastewater Section. 

Water and Wastewater Section Manager:

Keenan Hendon
Tel 307-777-7075, email: keenan.hendon2@wyo.gov

 

Water and Wastewater Construction Permitting:

Dale Lee, P.E - Central District Engineer
Tel 307-675-5640, email: dale.lee@wyo.gov

Dorran Larner- Northeast District Engineer
Tel 307-675-5644, email: dorran.larner2@wyo.gov

Hannes Stueckler, P.E.  – Northwest District Engineer
Tel 307-335-6961, email: hannes.stueckler@wyo.gov

Dennis Lewis, P.E. – Southeast District Engineer
Tel 307-777-7088, email: dennis.lewis@wyo.gov

Adam Keifenheim  – Southwest District Engineer
Tel 307-335-6962, email: adam.keifenheim@wyo.gov

Bradley Ellis, P.E.– SRF/Teton County Engineer
Tel 307-473-3469, email: bradley.ellis@wyo.gov

 

State Revolving Loan Fund (SRF):

Tim Eisenhauer, SRF Principal Engineer
Tel 307-777-6371, email: timothy.eisenhauer@wyo.gov

Greg Crocker, SRF Project Manager
Tel 307-777-6941, email: gregory.crocker@wyo.gov

 

Oil and Gas Produced Water Treatment and Disposal:

Christy Hutchinson, Principal
Tel 307-473-3452, email: christy.hutchinson@wyo.gov

 

Operator Certification:

Kim Parker
Tel 307-777-6128, email: kim.parker@wyo.gov

 

Enforcement:

Anthony Rivers
Tel 307-777-6183, email: anthony.rivers@wyo.gov

Permitting Forms and Information

Chapters 3, 11, 12, 25, 26, and 28 of the Wyoming Water Quality Rules outline the requirements for construction permitting and are available on the Secretary of State website, under the Department Environmental Quality, Water Quality program.

Permit Application Instructions
Step 1: Complete a
Water and Wastewater Permit to Construct Application form - Chapter 3 permit (See Below). Submit one copy of the design report and construction plans and specifications to the District Engineer for the county (see District Map) in which construction will take place, and one electronic copy to the WDEQ Water Quality Division Document Uploads link above.  Both copies must be sealed, signed, and dated by a Wyoming licensed Professional Engineer (PE).

If you are interested in submitting a Trade Secret Confidentiality Request, click here.

Step 2: DEQ will review the application for compliance with the Water Quality Rules.  The DEQ will issue an individual or general permit, or a permit by rule permit depending on the proposed design. Please contact the District Engineer for the county in which construction will take place if you need more information about which permit is required (see District Map).

Step 3: Once a permit is issued, the permittee shall complete construction within the timeframe specified in the permit, which will not exceed 5 years from the date of issuance or written notification of coverage.  If construction is not completed within this time frame, the permittee shall apply for a new construction permit.

Step 4: Submit a Certificate of Completion form (See Below) when construction is complete.

Submit a Transfer of Ownership form (See Below) if the ownership of a permitted facility is transferred to another party.

If the download box is not working below, please click here.

COWDF Resources

If the download box is not working below, please click here.

COWDF Draft Permits

If the download box is not working below, please click here.

District Map

Map of Water and Wastewater Districts showing the counties in each District, the District Engineers and Assistant District Engineers, and their contact information.

Interactive GIS map.  Use this map to determine the legal description or lat/long of your projects.